Completion of oil& gas transmission pipeline rehabilitation project
 
Owner: Northwest oilfield company, SINOPEC
 
 Tahe pipeline HDPD relining rehabilitation project is responsible by Xinjiang branch of 
our company, total length of oil & gas pipelines (3 lines) which requires rehabilitation 
is 36.45km, including 29.25km crude oil transmission pipeline, 3.6km condensate gas 
transmission pipelin(Cross Tarim River), 3.6km associated gas transmission pipeline
(Cross Tarim River)
 
  Since start of this project on July 16th, 2015, project department focused on 
construction quality and progress, technical proposal and detailed construction 
measures was prepared based on specific project conditions, such as complicated 
corrosion medium, severe corrosion environment, potential high risk of water pollution etc., 
therefore construction work was carried out smoothly under series of difficulties. 
 
Leading by project manager-Mr.Wang hongqin, ZEPE team, represented by 
Lv hongmin, Wang rengang, working hard together to the satisfaction of project owner. 
HDPE Pipe running through diameter-reduction machine
HDPE Pipe running through diameter-reduction machine
HDPE Pipe welding
HDPE Pipe welding 

Previous: Completion of West-East gas transmission pipeline
Next: Northwest PetroleumBureau KucheHot-tapping project

  
About us /  Customer service / Contact us Copyright ? 2010 Henan ZhongTuo Petroleum Engineering Technology Co.,Ltd All rights reserved
豫ICP備05002509號(hào)
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |